Assets

At Pasargad Energy Development Company (PEDC), we consider human resources our most valuable asset and firmly believe that our human capital forms the foundation of our physical assets. The utilization of this invaluable human capital has paved the way for acquiring and effectively managing physical assets, which include the following:

Pasargad Offshore Drilling Rig 100

The Pasargad 100 offshore drilling rig, built in 2012, features a Draw Works system with a power of 3,800 horsepower. It has a drilling capacity of 9,000 meters with a 5½-inch drill pipe and can operate in water depths of up to 90 meters. This rig is currently active in the South Pars gas field.

 

 

 

 

 

 

Pasargad Offshore Drilling Rig 200

The Pasargad 200 offshore drilling rig, constructed in 2019, is equipped with a Draw Works system offering 3,000 horsepower. It has a drilling capacity of 9,000 meters with a 5⅞-inch drill pipe and can operate in water depths of up to 90 meters. It is also actively engaged in the South Pars gas field.

 

 

 

 

 

 

 

 

Pasargad Onshore Drilling Rig 31

The Pasargad 31 onshore drilling rig, built in 2018, boasts a Draw Works system with 3,000 horsepower and a drilling capacity of 9,000 meters with a 5-inch drill pipe. It has a maximum load capacity of 6,750 kN and is operational in the Sepehr and Jofair oil fields.

 

 

 

 

 

 

 

Pasargad Onshore Drilling Rig 22

The Pasargad 22 onshore drillong rig, originally conatructed in 2025. Its Draw Works system provides 2000 horsepower, enabling a drilling capacity of 7000 meters with 5 1/2-inch drill pipe and a maximum load capacity of 4500 kN. It joins the Pasargad drilling rig fleet.

 

 

 

 

 

 

 

 

 

 

 

 

Pasargad Onshore Drilling Rig 21

The Pasargad 21 onshore drilling rig, originally constructed in 2012, underwent a complete overhaul in 2024. Its Draw Works system provides 2,000 horsepower, enabling a drilling capacity of 7,000 meters with a 4½-inch drill pipe and a maximum load capacity of 4,500 kN. This rig is also active in the Sepehr and Jofair oil fields.

 

 

 

 

 

 

 

 

Support Yards

To provide logistical and operational support for offshore drilling rigs, PEDC operates multiple support yards in Kish, Qeshm, Ahvaz, and other locations. These facilities ensure efficient and timely project execution. The support yards feature warehouses, covered storage spaces, and more, spanning over 26,200 square meters in Kish, 23,000 square meters in Ahvaz, and 1,800 square meters in Tehran, playing a critical role in supporting operational projects.

 

 

 

 

 

 

Drilling Service Equipment

The equipment located at PEDC's operational bases in Kish, used for directional drilling services, includes:

  1. Downhole Drilling Motors
  2. MWD (Measuring While Drilling) Tools
  3. LWD (Logging While Drilling) Tools & Radioactive Sources
  4. Gyro Tools & Wireline Unit with Running Accessories
  5. Rotary Steerable Services (RSS) – (Currently provided using third-party contractor equipment)
  6. Drilling Bits
  7. Pressurized MWD/LWD Units for Onshore and Offshore Projects (Zone Two Standards)
  8. Breakout Machines for Equipment Repairs
  9. Drilling Jar Testers for Repairing Percussive Drilling Tools
  10. Drill String Components, including Stabilizers, Drilling Jars, NMDCs, etc.

This comprehensive setup enables PEDC to deliver high-quality and efficient drilling services across its operational domains.

Drilling Service Equipment

The equipment located at PEDC's operational bases in Kish and Ahwaz, used for drilling services, includes:

  1.  Surface Well Testing
  2. Clean Up Tools   
  3. Full Bore DST
  4.  Slick Line
  5. Perforation Tubing
  6. Coiled Tubing Perforation
  7. Fluid Sampling Analysis
  8. Coiled Tubing
  9. Stimulation
  10. Nitrogen     
  11. Wire Line logging
  12. Wire Line Perforation
  13. Barge